Demolition in Miami, Phase by Phase: What North Miami Beach Owners Should Expect From Survey to Clean Slab

"Demolition" covers a lot of ground in Miami, from knocking out a kitchen in an Eastern Shores townhouse to taking down a rotted backyard shed or clearing a lot for a new house. The scale changes, but the sequence doesn't. Every project moves through the same phases, and skipping one is how a two-day job turns into a two-month delay.
Here's that sequence, phase by phase, written for property owners in North Miami Beach.
Phase 1: define the scope
Write down exactly what's coming out:
- Interior demolition: cabinets, flooring, drywall, fixtures, non-structural walls.
- Accessory structure: a shed, carport, screen enclosure, deck or fence.
- Whole structure: a house or building down to the slab, or including the slab.
Also list what stays. Load-bearing walls, plumbing stacks you'll reuse, the tree beside the shed. Scope drives every later phase, from permits to how much debris you'll haul.
Phase 2: clear the contents
A demolition crew can't work around a garage full of boxes or a house full of furniture. Contents have to come out first, and that's often the biggest single job in an older home or an estate property. Separate what you keep, what can be donated (see our furniture donation guide), and what gets hauled. Start this early. It sets the date demolition can begin.

Phase 3: test for asbestos and lead
Older South Florida buildings can hide asbestos in popcorn ceilings, floor tile and mastic, drywall joint compound and roofing, and lead in pre-1978 paint.
- Asbestos: Miami-Dade's asbestos program page requires a survey for all demolitions, and for renovations disturbing more than 160 square feet of suspect material. A Notice of Demolition goes to the County at least 10 working days (14 calendar days) before work starts. Regulated amounts begin at 160 square feet, 260 linear feet or 35 cubic feet. Removal requires licensed asbestos professionals. Federal rules are summarized on the EPA's asbestos NESHAP page.
- Lead: the EPA's RRP rule covers pre-1978 homes. Demolition of painted surfaces is covered regardless of size, and the firm must be EPA-certified.
Asbestos disposal is its own track too. Miami-Dade's disposal fee sheet sends asbestos to the South Dade Landfill only, by appointment.
Phase 4: pull the permit
In North Miami Beach, permits come from the City's Building Department (17050 NE 19th Ave, 305-948-2965), not Miami-Dade County. Applications go through the City's online permitting portal. The City doesn't post a demolition checklist online, so call first and ask about utility letters, site plans and protection requirements. Our North Miami Beach Building Department guide lists the questions to ask.
Phase 5: confirm who's doing the work
Florida law counts demolition as contracting. F.S. 489.105 includes anyone who, for pay, undertakes to demolish a building or structure. Verify licenses on the state DBPR lookup and Miami-Dade's contractor search, and ask for proof of insurance. The owner-builder exemption exists, but it comes with personal supervision requirements and resale restrictions.

Phase 6: disconnect utilities and handle trees
- Utilities: electric, gas, water and sewer must be disconnected, and capped where required, before a structure comes down. Call 811 before any digging. Utilities run on their own schedules, so request disconnects as soon as the permit path is clear.
- Trees: North Miami Beach enforces its own tree ordinance, and tree permits go through the City's Public Works Department. Protect trees you're keeping. Equipment and debris piles damage roots.
Phase 7: demolition day
For a small structure like a shed, demolition is often a day or less: roof off, walls down, framing cut, everything loaded as it comes apart. For interior demolition, the work goes room by room with dust control and protection for whatever stays. Whole-house demolition uses heavy equipment and takes more coordination: traffic, neighbors, fencing, and staging space for trucks.
Hurricane season matters in South Florida. A half-demolished structure or a pile of loose debris is a hazard if a storm comes. North Miami Beach asks residents not to put bulk out before a storm, and the same logic applies to demolition debris. Don't leave it sitting.

Phase 8: debris disposal
North Miami Beach's bulk pickup doesn't take construction or remodeling debris or concrete, so demolition needs its own disposal plan. In Miami-Dade, construction and demolition (C&D) debris goes to facilities like the County's North Dade Landfill, a Class III site that accepts it. The County's fee sheet, in effect since October 1, 2025, lists:
| Rate | Price |
|---|---|
| Non-contract disposal | $115.80 per ton |
| Contract disposal (permitted haulers with County contracts) | $76.12 per ton |
| Transfer station fee (non-contract), added to disposal | $17.30 per ton |
| Asbestos (South Dade only, by appointment) | $100 per ton plus special handling |
Weight drives disposal cost. Concrete, tile and plaster are heavy, while framing and drywall are bulky but lighter. Separating clean concrete and metal for recycling can reduce what goes to the landfill. See our North Dade Landfill guide and our article on where demolition debris goes in Florida.
Phase 9: final cleanup and inspection
A demolition isn't done when the walls are down. It's done when the site is clear: nails swept, the slab or ground left as the permit requires, utilities capped and inspected, and the final inspection closed out. An open permit can complicate a sale or a refinance later.
Interior demolition in a condo: the extra layer
A kitchen or bathroom gut in a North Miami Beach condo adds the association's rules on top of the City's:
- Board approval of the scope before work starts. Many associations require plans and contractor details.
- Work hours and noise limits, often stricter than the City's.
- Elevator protection and reservations for hauling debris down.
- Certificates of insurance naming the association.
- No debris in the building's dumpsters. Most associations require contractors to remove their own.
- Structural limits. Walls in concrete buildings may be structural or carry shared lines. Never remove one without the engineer's and board's sign-off.
Our guide to Florida condo rules for renovations goes further.
Be a good neighbor
Demolition is loud and dusty, and it means trucks on the street. Tell neighbors your dates, keep debris on your own property, sweep the street and sidewalk at the end of each day, and keep trucks off neighbors' swales. In alley-served blocks, keep the alley clear for Coastal's collection trucks.
What drives the cost of demolition
- Size and construction type: wood frame vs. concrete block, one story vs. two.
- Hazardous materials: asbestos abatement and lead-safe work add cost and time.
- Access: alley access, tight lots and condo rules on hours and elevators.
- Disposal weight and type: per-ton fees, transfer fees and special handling.
- Permits and utility work: fees, letters and capping.
- Contents: a full building costs more to clear than an empty one.
Where Junk Ranger fits
Junk Ranger Removal handles demolition services for sheds, interiors and other structures, construction debris removal, and the whole-house cleanouts that come first, throughout North Miami Beach and the rest of Miami-Dade County. For a related project, see our guide to shed, carport and screen enclosure demolition.

Frequently asked questions
Do I need a permit for demolition in North Miami Beach?
Is an asbestos survey required before demolition in Miami-Dade?
Does demolition require a licensed contractor in Florida?
Where does demolition debris go in Miami-Dade?
How much does it cost to dump demolition debris in Miami-Dade?
Can I put demolition debris out for bulk pickup in North Miami Beach?
Can I demolish my condo kitchen myself?
Who issues tree permits for demolition in North Miami Beach?
Keep reading
- Cost to Demolish a House in Florida: A Teardown Memo for Boca Raton and Delray Beach
- Interior Demolition in Florida: A Practical Guide
- Shed, Carport and Screen Enclosure Demolition in Florida
- All junk removal and demolition services in North Miami Beach

Junk Ranger Removal is a licensed and insured junk removal, cleanout and demolition crew serving North Miami Beach, Miami-Dade County and all of Florida. Free estimates: (561) 699-0121 · estimates@junkrangerremoval.com · Junk removal in North Miami Beach